Skip to content
Al-Birr wal-TaqwaWe Are With You
Water & Wells

A water purification station well

A full purification station on a 100-metre well that gives two or three villages safe drinking water, funded in shares.

Two station sizes

  • 10-metre station: 10,000 litres, serving about 3,300 people (two villages) — share EGP 12,500, full cost EGP 750,000
  • 15-metre station: 15,000 litres, serving about 4,500 people (three villages) — share EGP 15,000, full cost EGP 900,000

What the station includes

  • A 100-metre well and a 5×5 m room, 3 m high, marble outside and tiles inside, with a guard.
  • 14 to 20 taps for daily use.
  • Full treatment: chlorine pre-disinfection, an RO unit to bring salts to safe levels, then UV sterilisation.
  • A lab certificate that the water is fit for drinking, and free maintenance for the first year.
  • Each full share gets a 40×40 cm plaque with three full names.
  • Work takes about 3 months once all 60 shares are complete.

Where we build

  • In Ismailia, Sharqia and North Sinai, wherever need is greatest. Current drives: 10 station wells in Assiut and an urgent 15-metre station in Sinai (100 shares).
  • 19 stations are already running in Ismailia, Beni Suef, Minya, Beheira, Assiut, Qena and Sheikh Zuweid.

Give any amount, or pay a share over 12 months (EGP 1,042 or 1,250 a month).

Amount
EGP
Your details

Fully secured through an Egyptian payment gateway

Visa · Mastercard · Meeza · Vodafone Cash · InstaPay · Fawry